logo
Inicio ProductosLínea de producción de bandas de sujeción Pp

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

Estoy en línea para chatear ahora

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding
Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

Ampliación de imagen :  Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

Datos del producto:
Lugar de origen: Porcelana
Nombre de la marca: CHUQI
Número de modelo: CQ-SPP120-6
Pago y Envío Términos:
Cantidad de orden mínima: 1 juego
Detalles de empaquetado: CAJA DE MADERA
Tiempo de entrega: 60DÍAS
Condiciones de pago: T/T
Capacidad de la fuente: 10 juegos

Two-Stage Water Removal System with High-Pressure Airflow for Completely Dry Product Before Winding

descripción
Etapas de eliminación de agua.: Dos Potencia de la primera etapa: 4kW
Potencia de la segunda etapa: 7,5 kw Número de unidades: 4 cada uno
Principio de funcionamiento: Flujo de aire de alta presión Resultado: completamente seco
Posición: Después de los tanques, antes de dar cuerda.
Resaltar:

PP strapping band water removal system

,

Two-stage drying system for strapping

,

High-pressure airflow drying equipment

Two-Stage Water Removal System for Dry Product Before Winding
Product Overview

Residual moisture on the tape surface, if carried into subsequent embossing or winding processes, can cause unclear embossing, roll adhesion, or mildew. This production line is equipped with a two-stage water removal system to ensure complete drying before further processing.

System Operation

The first water removal device, located after the first cooling tank, uses a high-pressure centrifugal fan (4KW) with 4 suction pipe sets to initially remove bulk water. The second water removal device, at the outlet of the secondary cooling tank, features a high-pressure centrifugal fan (7.5KW) and 4 water removal units for efficient, fine drying. The two-stage system works together to ensure the tape entering the embosser and winder is completely dry.

Main Specifications
  • First water removal device: 4 suction pipe sets, high-pressure centrifugal fan 4KW
  • Second water removal device: 4 water removal units, high-pressure centrifugal fan 7.5KW
  • Working principle: High-pressure air blowing across top and bottom surfaces
  • Installation positions: After first tank, after secondary tank
Technical Parameters
Item First Water Removal Second Water Removal
Number of units 4 suction pipe sets 4 water removal units
Fan power 4 KW 7.5 KW
Fan type High-pressure centrifugal High-pressure centrifugal
Target 6 PP strands 6 PP strands
Installation position After first cooling tank Outlet of secondary cooling tank
Frequently Asked Questions
Why are two stages of water removal needed? Isn't one enough?
After the first tank, a large amount of water adheres to the tape surface; one stage can remove about 80%. However, the remaining water film still needs strong blowing. The second stage uses a more powerful fan to ensure complete dryness, especially adapting to reduced water splash at high speeds.
Will the airflow from the water removal units blow the tape off course?
The design uses a fan-shaped airflow with adjustable angle, directed tangentially to the tape surface, primarily generating shear force to peel off the water film, with minimal impact on the tape's running path. Proper adjustment prevents wandering.
Are the fans noisy?
High-pressure centrifugal fans do generate some noise, but the equipment includes noise reduction measures and protective covers. For noise-sensitive environments, optional additional sound enclosures or remote fan installation can be provided.